Hydroelectric Plants: EPC and BOP
Electromechanical. Reforms and Modernizations
Substations up to 500kV
EPC and Electromechanical BOP of
Thermoelectric Plants: Biomass and LNG
Operation and Maintenance
• Turbines
• Generators
• Electrical and mechanical auxiliary systems
• Hydromechanics
• Lifting equipment
• SDCP
• Telecom
• Substations and Transmission Lines
in projects in operation
(greenfield and revamping)
projects in UHE’s, PCH’s and CGH’s
years of experience in the market
EPC INCLUDING:
• Basic and executive design
• Supply of equipment
• Construction
• Assembly and commissioning with its own team
EPC and Electromechanical BOP of Biomass and LNG Plants
What we do:
• 2 Francis turbines - 375 MW / each
• Substation-GIS- SF6 (400 kV) remembering: lowercase k and uppercase
• Mechanical auxiliary system
• Auxiliary electrical systems
• Shielded busbars
• Auxiliary unit (3 MW with horizontal Francis turbine)
• SCADA system
• All with engineering, supply, assembly and commissioning supervision
SCOPE:
Design, supply of materials and supervision of assembly of electrical and mechanical auxiliary systems.
Saint George of Oiapoque - French Guiana
SCOPE:
• 1st French city to be 100% powered by renewable energy
• 1st land transport between Brazil and France
• 85,000m² plant in the Amazon territory
• Turnkey solution
• Complete engineering concept
• Supply of 1,000 tons of equipment
• Plant equipped with: 01 substation, 01 chipper, 01 wooden silo, 02 boilers, 01 turbine-generator set, 01 rainwater basin
ESCOPO:
• Civil, electromechanical and MPCCS projects
• Electromechanical assembly of 1 3 x60MVAr bus reactor bank - 525kV
• Electromechanical assembly of the 3rd 500/230 / 13.8 autotransformer bank kV- 3 x 250MVA and connections